beforecontenttitle
Malpasset 1959 Dam Failure (France)
Después del título del contenido
Antes del cuerpo del contenido
Trozos html editables
Trozos html editables
Figure 1. Comparison between the simulated maximum water level at 9 stations through the river basin and the actual measured values. Two numerical resolutions were used for the numerical model, 5 and 10 meters
Figure 2. Comparison between the simulated first wave arrival time at 9 stations through the river basin and the actual measured values. Two numerical resolutions were used for the numerical model, 5 and 10 meters
Después del cuerpo del contenido